Diodes for chargers, adapters and power supplies
The most price-sensitive segment we serve, and the one where saving half a cent on a rectifier can cost a container of returns.

Three numbers, and only three.
Buyers in this segment compare unit price, stock availability and lead time. Everything else is a tiebreaker. We price from the factory floor, hold the common rectifier and Schottky part numbers in stock, and accept trial orders from 5,000 pieces.
What we will not do is quote a forward voltage we cannot hold in volume. A 0.02 V drift on a Schottky in a 65 W adapter shows up as heat, then as a field return six months later.
- 5,000-piece minimum on catalog parts
- Common parts (1N400x, SS34, ABS10) shipped from stock
- Batch-to-batch VF held to the datasheet limit, not a relaxed internal one
Where each family sits in the design.
| Circuit position | Family | Typical parts | Why this one |
|---|---|---|---|
| AC input rectification | Bridge rectifier | ABS10, MB10S, GBU808 | Four diodes in one package saves board area |
| Secondary rectification, 5–24 V | Schottky | SS34, SS310, SS54 | Low forward drop at the switching frequency |
| RCD snubber and clamp | Fast recovery | FR107, RS1M | Recovery time short enough to keep the switch cool |
| Bias and auxiliary rail | General rectifier | 1N4007, 1N4148W | Cheapest part that meets the reverse voltage |
| Input surge path | TVS (supplied on request) | SMBJ series | Clamps the line transient before the bridge |
Three problems we design around.
Every one of these is a process problem, not a design problem. They are also the three complaints we hear most from adapter makers.
Forward voltage creep
Die attach voids raise VF over a production run. We screen on VF at final test, per lot, and hold the data.
Surge failure at plug-in
Inrush through the bridge is the first thing to fail on a cheap adapter. Surge current is tested to the datasheet rating on every family.
Mixed lots in one carton
Marking and date code are recorded per reel. If a customer traces a problem back to a batch, we can find the wafer lot.
Send the part number and the application.
We will confirm the equivalent, the price at your quantity and the lead time — usually within 48 hours.