ISO 9001 · ISO 14001 · RoHS & REACH Exporting to Southeast Asia, South Asia and Europe
sales@tddsemi.com +86 373 772 2282

Diodes for inverters, storage and charging

Auxiliary power, gate drive and sensing rails — the places where a cheap diode takes down an expensive system.

Diode assembly lines at the Xinxiang plant
Why this segment buys differently

Reliability beats price by an order of magnitude.

A failed diode in a 100 kW inverter auxiliary supply is not a diode problem. It is a service call, a truck roll and a warranty claim. Buyers here will pay 30% more for a part that holds its specification over ten years.

What they need from us is not the lowest quote, it is evidence: lot-level test data, a stable process, and a supplier who answers a failure question in days rather than weeks.

  • Lot-level VF, IR and VRRM data retained and available
  • High-temperature reverse bias sampling on every production lot
  • Failure analysis report within 10 working days
Where our parts go

Four positions we supply today.

Auxiliary and bias supplies

Flyback and buck stages inside the inverter, 5–24 V rails feeding gate drivers and sensors.

Gate drive clamping

Fast recovery diodes across the gate resistor, keeping the switching node inside the driver rating.

BMS sensing and OR-ing

Schottky OR-ing between battery packs and the DC bus, plus reverse protection on sense lines.

AC/DC charging modules

Input bridge and PFC output rectification in 7–22 kW charger power stages.

How a qualification project runs

From sample to approved vendor in four steps.

  1. 01

    Sample and datasheet

    Up to 50 pieces of any catalog part, shipped within a week, with the full parameter table and package drawing.

  2. 02

    Bench validation

    You run thermal and surge tests on your board. We support with derating curves and, where needed, alternative parts from the same die.

  3. 03

    Lot data review

    We send three consecutive lots with final test data so your quality team can check distribution, not just pass or fail.

  4. 04

    Production release

    Reel-level traceability, agreed incoming inspection criteria and a named contact for quality issues.

Send the part number and the application.

We will confirm the equivalent, the price at your quantity and the lead time — usually within 48 hours.