Failure analysis and 8D

A supplier is judged by what happens after something goes wrong, not before.

Process

Five stages, with a clock on each.

  1. 1. Acknowledge — within 24 hours

    Every failure report gets an owner by name and a case number, even before we know anything. Silence is the thing customers complain about most.

  2. 2. Containment — within 48 hours

    Stock at your site, in transit and in our warehouse is identified by date code and put on hold. We tell you which lots are affected before we know the cause.

  3. 3. Analysis — within 7 days

    Curve trace, X-ray, decap and cross-section as needed. We share raw images, not just conclusions, so your engineer can disagree with us.

  4. 4. 8D report — within 10 working days

    Root cause, escape point, corrective action and verification plan. If the root cause is on your side — a solder profile, a surge event — the report says so.

  5. 5. Verification — next three lots

    The corrective action is checked on the next three production lots, with data attached to the closing report.

Common failure modes

What we find most often, and why.

Observed failureUsual root causeWhose side
Short circuit after months in serviceSurge beyond IFSM rating at power-onDesign margin
Leakage rising with temperatureDie attach void or passivation damageOur process
Open circuit at the leadThermal cycling with a rigid lead formAssembly design
VF drift across a batchDie lot variation not screened outOur process
Cracked body after reflowMoisture absorption before reflowStorage and handling

What to send with a failure report

The faster we get these, the faster the analysis converges. Missing information is the main reason a case takes three weeks instead of one.

  • Part number, date code and quantity affected
  • Application, rail voltage and current in normal operation
  • Failure rate: how many out of how many, over what period
  • Board photos showing the diode location and any heat damage
  • Reflow profile and storage conditions, if the failure is at assembly

Send the part number and the application.

We will confirm the equivalent, the price at your quantity and the lead time — usually within 48 hours.